The cost of the status quo
The field builds it. The office loses it.
This is not about winning the work. It is the change orders, the RFIs, and the closeout that leak margin after the crew is already done.
Extras built, never billed
Change orders done in the field, never written up.
▸ open the change-order log
RFIs pile up, unpriced
Answers stall, the schedule slips.
▸ open the RFI log
Closeout drags for months
Punch, O&M, and retainage sit.
▸ open the closeout sheet
You do not need one more app for the crews.You need the work they already do, turned into billing.
02 / 06